Call Gary directly at: 416 483-1888

Significant Accomplishments

Successfully mediated construction disputes up to $ 1.4 Million

Designed and constructed many critical tunnel crossings of major highways, railways, and rivers across Ontario utilizing all available tunnel construction methods

Designed and supervised the construction of large access tunnel through loose talus and bedrock, including 60 m deep elevator shafts for Maid-of-the-Mist facility, Niagara Falls

Travelled extensively in Europe, Japan and the United States investigating the new trenchless technologies including microtunnelling, pipeline renewal by slip lining and spray lining, and directional boring

Consulted in the development of the first microtunnelling machine built in Canada

Travelled to Kuwait to assess the feasibility of microtunnelling for a major sewage expansion project, Kuwait City

Facilitated the completion of a major industrial building in difficult soil and weather conditions, Scarborough

Acted as project manager for the high risk, high profile and highly successful Library of Parliament rock excavation project, Ottawa